Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
体育博彩平台
Gambling-platform-service@modonexpress.net
Gaming-platform-info@dowtek.net
皇冠体育app
火博体育
Sun-City-contactus@promisesurfing.net
Top-ten-lottery-gambling-platforms-service@mulher-perfeita.net
Venice-Macao-marketing@tamascandle.net
新葡京博彩官网
十大彩票网赌平台
路客精品民宿
Sports-betting-support@kiaabs.net
佳和电气
道德网
皇冠体育
博彩平台
泰兴银杏花园论坛
江苏卫生人才网
充电头网
中华义工社区
驾校一点通
国光电器股份有限公司
重庆招考信息网
金英网
河池赶集网
天翼快递
58同城全国分类信息网
景川诊断
安机网
搜房网常州租房网
手机深圳通
河南职业技术学院
嗨学网
建东科技